Sample Page

The Artemis program is a Moon exploration program led by the United States’ National Aeronautics and Space Administration (NASA), aimed at returning humans to the Moon for the first time since Apollo 17 in 1972. It was formally established via Space Policy Directive-1 in 2017.

Among the principal elements of the Artemis program are Space Shuttle–derived hardware, such as the Space Launch System’s (SLS) core stage, its RS-25 engines, and solid rocket boosters, as well as systems originating in the canceled Constellation program, including the Orion spacecraft (paired with the European Service Module) and booster upgrades initially developed for Ares V. Other elements, such as the Human Landing System (HLS), are in development by private spaceflight companies under contract. International collaborations are bound by the Artemis Accords.

The uncrewed Artemis I mission sent an Orion spacecraft to lunar orbit in 2022. Artemis II sent four astronauts on a lunar flyby in 2026. Artemis III, scheduled for 2027, is planned to test an HLS lunar lander in Earth orbit. The first lunar landing of the program is planned for the Artemis IV mission, targeted for 2028. Afterwards, NASA intends yearly lunar landings to develop a permanent base on the Moon, as a stepping stone to human missions to deeper space.

Overview

The Artemis program is organized around a series of missions of increasing complexity, intended to be spaced about a year apart. NASA and its partners have planned missions Artemis I through Artemis V, with additional missions proposed. Each numbered mission centers on launching an SLS rocket carrying an Orion spacecraft. Missions after Artemis II will also rely on support missions by other organizations and spacecraft. Referred to under the name Lunar Codex, Artemis missions have also contemplated sending to the moon an archive of cultural works from creators across the globe.[9]

The core infrastructure of Artemis consists of SLS, Orion, and the HLS. Additional program elements include the Commercial Lunar Payload Services, Exploration Ground Systems, Artemis Base Camp, the Lunar Terrain Vehicle, and spacesuit development.[10][11][12] Certain program choices, including the use of a near-rectilinear halo orbit and long-term sustainability plans, have drawn criticism.

Orion’s first launch on SLS, originally scheduled for 2016, was delayed repeatedly and ultimately flew on November 16, 2022, as Artemis I, carrying mannequins and robotic payloads. The crewed Artemis II (lunar fly-by) mission flew on April 1, 2026. The future Artemis III (Earth orbit) is planned for mid-2027, Artemis IV (lunar landing) for early 2028 and Artemis V (lunar landing) for late 2028. NASA plans approximately annual lunar landings thereafter.[13]

SLS missions

  • Artemis I (November 16, 2022) was the first uncrewed test flight of the SLS, Orion, and ESM.[i] The mission sent Orion into a polar distant retrograde lunar orbit for about six days before returning to Earth, where the capsule re-entered the atmosphere and splashed down in the Pacific Ocean under parachutes.[14] Although the mission was successful overall, Orion’s ablative heat shield experienced greater-than-expected erosion during reentry.[15]
  • Artemis II (April 1, 2026) was the first crewed test flight of SLS and Orion.[16] The four crew members performed extensive testing of the spacecraft in high Earth orbit before Orion was boosted into a free-return trajectory around the Moon, returning to Earth for re-entry and splashdown. The mission was broadly comparable to Apollo 7 and Apollo 8, although Artemis II did not orbit the Moon and flew a more distant lunar flyby than the Apollo missions.[16][17][18]
  • Artemis III (mid-2027) is planned to be the second crewed Artemis mission. The crew will launch aboard SLS/Orion and conduct rendezvous and docking tests in Earth orbit with one or both commercially developed lunar landers launched separately—SpaceX‘s Starship HLS and Blue Origin‘s Blue Moon—as well as test the Axiom Extravehicular Mobility Unit (AxEMU) space suit.[13][19] The mission is broadly comparable to Apollo 9.
  • Artemis IV (early 2028) is planned to be the first American crewed lunar landing since Apollo 17 in December 1972.[16] The mission depends on a prior support flight to place a lander in lunar orbit before the launch of SLS/Orion. After arrival, astronauts will transfer to the lander for descent to the lunar surface, conduct at least two extravehicular activities (EVAs), and then return to lunar orbit for rendezvous with Orion. Orion will subsequently return the four astronauts to Earth. Launch is scheduled for no earlier than early 2028.[13][20]
  • Artemis V (late 2028) is planned to be the second crewed lunar landing. This mission also is when NASA is expected to begin building its Moon base.[13]

History

An artist’s rendering of the lunar module (left) and Orion spacecraft envisioned during the Constellation program

Early history

The Artemis program incorporates several major components of previously cancelled NASA programs and missions, including the Constellation program and the Asteroid Redirect Mission.

Originally legislated by the NASA Authorization Act of 2005, as the retirement of the Space Shuttle drew near, the Constellation program included the development of the Ares I and Ares V rockets along with the Orion spacecraft.[21] In May 2009, U.S. president Barack Obama established the Augustine Committee to take into account several objectives including support for the International Space Station, development of missions beyond low Earth orbit (including the Moon, Mars, and near-Earth objects), and use of the commercial space industry within defined budget limits.[22] The committee concluded that the Constellation program was massively underfunded and that a 2020 Moon landing was impossible. Constellation was subsequently put on hold.[23]

On April 15, 2010, President Obama spoke at the Kennedy Space Center, announcing the administration’s plans for NASA and cancelling the non-Orion elements of Constellation, saying that the program was not viable.[24] He instead proposed US$6 billion in additional funding and called for the development of a new heavy-lift rocket program to be ready for construction by 2015 with crewed missions to Mars orbit by the mid-2030s.[25]

On October 11, 2010, President Obama signed into law the NASA Authorization Act of 2010, which included requirements for the immediate development of the SLS rocket and the Orion spacecraft to support missions beyond low Earth orbit starting in 2016, while making use of the workforce, assets, and capabilities of the Space Shuttle program, Constellation program, and other NASA programs. The law also invested in space technologies and robotics capabilities tied to the overall space exploration framework, ensured continued support for Commercial Orbital Transportation Services, Commercial Resupply Services, and expanded the Commercial Crew Development program.[26]

On June 30, 2017, President Donald Trump signed an executive order to re-establish the National Space Council, chaired by Vice President Mike Pence. The administration’s first budget request kept Obama-era human spaceflight programs: Commercial Resupply Services, Commercial Crew Development, the Space Launch System, and the Orion spacecraft for deep space missions, while reducing Earth science research and calling for the elimination of NASA’s education office.[27]

Redefinition and naming as Artemis

On December 11, 2017, President Trump signed Space Policy Directive 1, calling for a U.S.-led program for a human return to the Moon, followed by missions to Mars and beyond. The policy calls for the NASA administrator to “lead an innovative and sustainable program of exploration with commercial and international partners to enable human expansion across the Solar System and to bring back to Earth new knowledge and opportunities”. The effort intends to more effectively organize government, private industry, and international efforts toward returning humans to the Moon and working toward eventual human exploration of Mars.[2]

Space Policy Directive 1 authorized the lunar-focused campaign, later named Artemis, drawing upon legacy U.S. programs, including the Orion space capsule, the Lunar Gateway space station, and Commercial Lunar Payload Services, and created the new Human Landing System program. The Space Launch System was expected to serve as the primary launch vehicle for Orion, while commercial launch vehicles were to launch various other elements of the program.[28]

The Orion capsule in the Pacific Ocean, following the Exploration Flight Test-1 mission

On March 26, 2019, Pence announced that NASA’s Moon landing goal would be accelerated by four years with a planned landing in 2024.[29] On May 16, 2019, NASA Administrator Jim Bridenstine announced that the new program would be named Artemis, after the goddess of the Moon in Greek mythology who is the twin sister of Apollo, after which NASA’s 1960’s moon landing program was named.[30][31] Mars missions by the 2030s were still intended as of May 2019.[2]

In mid-2019, NASA requested US$1.6 billion in additional funding for Artemis for fiscal year 2020,[32] while the Senate Appropriations Committee requested from NASA a five-year budget profile[33] which is needed for evaluation and approval by Congress.[34][35]

In February 2020, the White House requested a funding increase of 12% to cover the Artemis program as part of its fiscal year 2021 budget. The total budget would have been US$25.2 billion per year with US$3.7 billion dedicated toward a Human Landing System. NASA chief financial officer Jeff DeWit said he thought the agency had “a very good shot” to get this budget through Congress despite Democratic concerns around the program.[36] However, in July 2020, the House Appropriations Committee rejected the White House’s requested funding increase.[37] The bill proposed in the House dedicated only US$700 million toward the Human Landing System, 81% (US$3 billion) short of the requested amount.[38]

In April 2020, NASA awarded funding to Blue Origin, Dynetics, and SpaceX for 10-month-long preliminary design studies for the HLS.[39][40][41]

On February 4, 2021, the Biden administration endorsed the Artemis program.[42] More specifically, White House Press Secretary Jen Psaki expressed the Biden administration’s “support [for] this effort and endeavor”.[43][44][45] However, throughout February 2021, Acting Administrator of NASA Steve Jurczyk reiterated those budget concerns when asked about the project’s schedule,[46][47] clarifying that “The 2024 lunar landing goal may no longer be a realistic target […]”.[48]

On April 16, 2021, NASA contracted SpaceX to develop, manufacture, and fly two lunar landing flights with the Starship HLS lunar lander.[49] Blue Origin and Dynetics protested the award to the Government Accountability Office (GAO) on April 26.[50][51] After the GAO rejected the protests,[52] Blue Origin sued NASA over the award,[53][54] and NASA agreed to stop work on the contract until November 1 as the lawsuit proceeded. The judge dismissed the suit on November 4, and NASA resumed work with SpaceX.[55]

On November 15, 2021, an audit of NASA’s Office of Inspector General estimated the true cost of the Artemis program at about $93 billion until 2025.[1]

In addition to the initial SpaceX contract, NASA awarded two rounds of separate contracts in May 2019[56] and September 2021,[57] on aspects of the HLS to encourage alternative designs, separately from the initial HLS development effort. It announced in March 2022 that it was developing new sustainability rules and pursuing both a Starship HLS upgrade (an option under the initial SpaceX contract) and new competing alternative designs. These came after criticism from members of Congress over the lack of redundancy and competition, and led NASA to ask for additional support.[58][59]

Missions

Mission and patch Launch Crew Lander Duration Goal Status
Artemis I
November 16, 2022[60][4] N/a N/a 25 days[61] Uncrewed lunar orbit and return Success
Artemis II
April 1, 2026 N/a 9 days[62] Crewed lunar flyby Success
Artemis III Mid-2027[13] TBA Blue Moon or Starship HLS TBA Crewed test of HLS in low Earth orbit Planned
Artemis IV Early 2028[13] TBA[ii] Blue Moon or Starship HLS ~30 days Lunar landing Planned
Artemis V Late 2028[13] TBA[iii] Blue Moon or Starship HLS ~30 days Lunar landing, begin moonbase construction Planned

Orion test flights

The Pad Abort-1 test on May 6, 2010, demonstrated Orion’s launch abort system, proving it could pull a crew module away from a rocket during a pad emergency.[65] The Ascent Abort-2 test on July 2, 2019, proved that the system could pull a crew module away during launch at the point of maximum aerodynamic pressure (max q).[66][67][68] For the second test, the boilerplate capsule launched on a custom Minotaur IV-derived rocket.[68][69]

In between, a prototype Orion crew module flew on Exploration Flight Test-1 on December 5, 2014[70][71] atop a Delta IV Heavy rocket. Its reaction control system and other components were tested during two medium Earth orbits, reaching an apogee of 5,800 km (3,600 mi) and crossing the Van Allen radiation belts before making a high-energy re-entry at 32,000 km/h (20,000 mph).[72][73]

Artemis I (2022)

Orion capsule shortly after splashdown in the Pacific Ocean on December 11, 2022.

Artemis I was originally scheduled for late 2016, and as delays accrued, eventually for late 2021, but the launch date was then pushed back to August 29, 2022.[74] Various delays related to final infrastructure repairs and weather pushed the launch date further out.[75]

In October 2022, NASA launch managers decided on a new launch date in November, which was again slightly delayed due to preparation and weather.[76][60][4] On November 16 at 01:47:44 EST (06:47:44 UTC), Artemis I successfully launched from the Kennedy Space Center.[77]

Artemis I was completed at 09:40 PST (17:40 UTC) on December 11, when the Orion spacecraft splashed down in the Pacific Ocean, west of Baja California, after a record-breaking mission, which saw Artemis travel more than 2.3 million kilometers (1.4 million miles) on a path around the Moon before returning safely to Earth. The splashdown occurred 50 years to the day since NASA’s Apollo 17 Moon landing, the last human crewed mission to touch down on the lunar surface.[78]

Artemis II (2026)

Official crew portrait, clockwise from left: Koch, Glover, Hansen and Wiseman


Artemis II was a crewed lunar flyby mission on April 1–11, 2026. It was the first crewed flight of the NASA-led Artemis program and the first crewed flight beyond low Earth orbit since Apollo 17 in 1972. Artemis II was the second flight of the Space Launch System (SLS) and the first crewed flight of the Orion spacecraft, named Integrity by the four-person crew.

The mission was a test flight supporting subsequent Artemis missions aimed at returning humans to the lunar surface. Originally designated Exploration Mission-2 (EM-2) and intended to support the canceled Asteroid Redirect Mission, its objectives were revised after the establishment of the Artemis program in 2017. The mission’s primary goal was to validate the Orion spacecraft’s systems, crew operations, and mission procedures ahead of sustained lunar exploration in future Artemis missions.[79] Artemis II’s mission objectives were similar to those of Apollo 8 in 1968, the first crewed lunar flight of the Apollo program, while its free-return trajectory resembled that flown by Apollo 13 in 1970.

Among the four crew members, Victor Glover is the first person of color, Christina Koch the first woman, Canadian Space Agency astronaut Jeremy Hansen the first non-U.S. citizen, and commander Reid Wiseman the oldest person to travel beyond low Earth orbit and around the Moon. During their lunar flyby, the crew set the record for human distance from Earth, 252,756 miles (406,771 km), breaking Apollo 13’s record of 248,655 miles (400,171 km).

After launch, Artemis II gained widespread global attention for its achievements and inclusive crew, giving rise to the term Moon joy.

Artemis II splashed down in the Pacific Ocean on April 11 at 00:07 UTC, concluding their nine-day trip around the Moon.

Artemis III (2027)

Artemis III is planned to be the second crewed mission of the NASA-led Artemis lunar exploration program, with a targeted launch in mid-2027. The crew will launch aboard the Space Launch System (SLS) rocket carrying the Orion spacecraft.

The mission will rendezvous in Earth orbit with one or both commercially developed Human Landing System (HLS) vehicles—SpaceX‘s Starship HLS and Blue Origin‘s Blue Moon—which will be launched separately by their commercial providers. The mission will test rendezvous and docking operations and may also include evaluation of the Axiom Extravehicular Mobility Unit (AxEMU) space suit. It is broadly comparable to Apollo 9 in the Apollo program.

Artemis III was originally planned as the first crewed lunar landing since Apollo 17 in 1972.[80] By 2023, however, NASA had indicated the mission could proceed without a landing due to Orion spacecraft heat shield concerns and delays in the development of the Starship HLS. Alternative concepts studied included a crewed visit to the now-cancelled Lunar Gateway space station and a low Earth-orbit docking test between Orion and the Starship HLS.[81]

On February 27, 2026, NASA administrator Jared Isaacman confirmed a revised plan for Artemis III to perform tests with one or both landers in Earth orbit, with Artemis IV tentatively designated as the first crewed lunar landing mission of the Artemis program, scheduled for 2028.

Artemis IV (early 2028)

Artemis IV is planned to be the third crewed mission and first lunar landing of the NASA-led Artemis program, marking the first crewed landing on the Moon since Apollo 17 in 1972.

For this mission, a Space Launch System (SLS) rocket will send an Orion spacecraft carrying the four astronaut crew members to lunar orbit. The mission depends on a prior support flight to place a lunar lander—either SpaceX‘s Starship HLS or Blue Origin‘s Blue Moon—into lunar orbit before the crew launch. When Orion docks with the lander, two astronauts will transfer to it, descend to the lunar surface and conduct extravehicular activities there.[82] They will then ascend back to the Orion waiting in lunar orbit, which will return the four astronauts to Earth. As of March 2026, NASA is targeting early 2028 for launch.[83]

Before October 2022, the goal for Artemis IV was simply to deliver the I-HAB module to the Lunar Gateway. Between October 2022 and February 2026, it was set to be the second lunar landing of the Artemis program, after the planned Artemis III,[84] before the Lunar Gateway was cancelled in February 2026 and this mission became the first planned lunar landing.[85]

Artemis V (late 2028)

Artemis V is planned to be the fourth crewed mission and second lunar landing of the NASA-led Artemis program. The mission is expected to see the first efforts by NASA to begin building a permanent Moon base. As of March 2026, launch is scheduled for late 2028.[86]

Originally, Artemis V was proposed as the program’s third lunar landing mission, sending an Orion spacecraft with four astronauts to the now-cancelled Lunar Gateway space station, where they would install two elements before heading to the lunar surface.[87]

Supporting programs

Commercial Lunar Payload Services

Models of the first three commercial landers selected for the program. Left to right: Peregrine by Astrobotic Technology, Nova-C by Intuitive Machines, and Z-01 by OrbitBeyond.

Commercial Lunar Payload Services (CLPS) is a NASA program to hire companies to send small robotic landers and rovers to the Moon. Most landing sites are near the lunar south pole[88][89] where they will scout for lunar resources, test in situ resource utilization (ISRU) concepts, and perform lunar science to support the Artemis lunar program. CLPS is intended to buy end-to-end payload services between Earth and the lunar surface using fixed-price contracts.[90][91] The program achieved the first landing on the Moon by a commercial company in history with the IM-1 mission in 2024. The program was extended to add support for large payloads starting after 2025. In 2026 NASA proposed a “CLPS 2.0” initiative.[92]

The CLPS program is run by NASA’s Science Mission Directorate along with the Human Exploration and Operations and Space Technology Mission directorates. NASA expects the contractors to provide all activities necessary to safely integrate, accommodate, transport, and operate NASA payloads, including launch vehicles, lunar lander spacecraft, lunar surface systems, Earth re-entry vehicles and associated resources.[91]

Eight missions have been contracted under the program (excluding a mission contract that was revoked after awarding, and a mission contract that was cancelled after the contracted company went bankrupt).

Artemis Accords

Signatory nations of the Artemis Accords, highlighted in blue, as of January 2026

The Artemis Accords are a set of non-binding multilateral arrangements[93] between the United States government and other world governments that elaborates on the norms expected to be followed in outer space.[94]

As of January 26, 2026, with the accession of Oman, 61 countries have signed the Accords,[95] including 28 in Europe, 15 in Asia, seven in South America, five in North America, four in Africa, and two in Oceania.

Drafted by NASA and the U.S. Department of State, the Accords establish a framework for cooperation in the civil exploration and peaceful use of the Moon, Mars, and other astronomical objects.[96] They are explicitly grounded in the United Nations Outer Space Treaty of 1967, which signatories are obliged to uphold, and cite most major U.N.-brokered conventions constituting space law.[97][98][99][100][101]

The Accords were originally signed on October 13, 2020, by representatives of the national space agencies of eight countries: Australia, Canada, Italy, Japan, Luxembourg, the United Arab Emirates, the United Kingdom, and the United States.[97] The Accords remain open for signature indefinitely, as NASA anticipates more nations joining.[102] Additional signatories can choose to directly participate in Artemis program activities, or may agree simply to commit to the principles for responsible exploration of the Moon as set out in the Accords.[103]

Exploration Ground Systems (EGS)

Exploration Ground Systems logo

The Exploration Ground Systems (EGS) program was established to develop, modernize, and operate the ground infrastructure at NASA‘s Kennedy Space Center (KSC) in Florida required to process, assemble, transport, and launch rockets and spacecraft.[104] The program supports NASA’s human spaceflight initiatives, including the Space Launch System (SLS) and the Orion spacecraft used in the Artemis program.[105][106]

EGS is responsible for maintaining and adapting legacy Apollo– and Space Shuttle–era facilities, while also developing new systems to support evolving launch vehicle configurations. These efforts have included modifications to support SLS Block 1 missions, as well as planning for more advanced variants, although some upgrades have been revised or cancelled as program requirements have changed.

The program operates and maintains several major facilities and systems at KSC, including the Vehicle Assembly Building, where rockets are vertically integrated; the Launch Control Center, which houses the firing rooms used for launch operations; and the Crawler-Transporter fleet (CT-1 and CT-2), which transports mobile launchers and rockets to the launch pad. EGS also manages mobile launch platforms, including Mobile Launcher-1 (ML-1), while construction of Mobile Launcher-2 (ML-2) was halted following changes to SLS program requirements. Launch operations are conducted from Launch Complex 39B, which has been modernized to support Artemis missions.

Supporting Earth-launch vehicles

As of the early mission concepts outlined by NASA in May 2020 and refined by the HLS contract award in July 2021, the primary Earth-launch vehicles planned to support the Artemis program will include the NASA Space Launch System for the Orion vehicle, the Falcon Heavy for various components of the Lunar Gateway,[107] and the Starship HLS configuration for the eventual delivery of the HLS vehicle. Other standard SpaceX Starships may be used later to meet other and yet to be determined crew or cargo handling mission needs.[108] Additional launch vehicles will also be employed later for CLPS cargo services. The European Ariane 6 has been proposed to be part of the program in July 2019.[109]

The Power and Propulsion Element (PPE) module and the Habitation and Logistics Outpost (HALO) of the Gateway, which were previously planned for the SLS Block 1B,[110] will now fly together on a Falcon Heavy in 2027.[111][112][113] The Gateway will be supported and resupplied by approximately 28 commercial cargo missions launched by undetermined commercial launch vehicles.[114] The Gateway Logistics Services (GLS) will be in charge of resupply missions.[114] GLS has also contracted for the construction of a resupply vehicle, Dragon XL, capable of remaining docked to the Gateway for one year of operations, providing and generating its own power while docked, and capable of autonomous disposal at the end of its mission.[114][115][116]

In May 2019, the plan was for components of a crewed lunar lander to be deployed to the Gateway on commercial launchers before the arrival of the first crewed mission, Artemis III.[117] An alternative approach where the HLS and Orion dock together directly was discussed.[118][119]

As late as mid-2019, NASA considered use of Delta IV Heavy and Falcon Heavy to launch a crewed Orion mission given SLS delays.[120] Given the complexity of conversion to a different vehicle, the agency ultimately decided to use only the SLS to launch astronauts.[8]

Launch vehicles
Launch
vehicle
Missions Payload Estimated cost
per launch
First launch
LEO (Low Earth Orbit) TLI (Trans-Lunar Injection)
Space Launch System Crew transportation 95 t 27 t US$2 billion November 16, 2022[4]
Starship Starship HLS 200 t[121] 200 t[a] US$2 million (goal)[122][b] April 20, 2023[123]
New Glenn Blue Moon 45 t 7 t $68 million January 16, 2025[124]

Space Launch System

SLS Block 1 at Kennedy Space Center Launch Complex 39B for Artemis II.

The Space Launch System (SLS) is an American two-stage super heavy-lift expendable launch vehicle used by NASA. The primary launch vehicle for the Artemis program, SLS is designed to launch the four-person Orion spacecraft for missions to the Moon, on a trans-lunar injection trajectory. The rocket first launched on November 16, 2022, carrying the uncrewed Artemis I mission. Its first crewed launch was for the Artemis II lunar flyby on April 1, 2026, becoming the second launch vehicle to carry humans beyond low Earth orbit, after NASA’s Saturn V of the Apollo program, and the third to ever be planned to fly humans past LEO, after the N1.

Development of SLS began in 2011 as a congressionally mandated replacement for the retiring Space Shuttle program and the cancelled Ares I and Ares V launch vehicles of the Constellation program, incorporating some hardware from both programs. Costing US$31.6 billion as of 2025, the project has been criticized for mismanagement, budget overruns, and delays, but ultimately succeeded in human spaceflight in 2026.

All SLS launches take place from Launch Complex 39B at the Kennedy Space Center in Florida. SLS’ first stage uses the new Boeing-built core stage, powered by four Shuttle-derived RS-25 engines. Attached to the core are two Northrop Grumman five-segment Solid Rocket Boosters, built for the Ares vehicles, tested on Ares I-X, and developed from the Shuttle’s four-segment SRB. SLS currently uses the Interim Cryogenic Propulsion Stage (ICPS) as its second stage, for the insertions to low Earth orbit and trans-lunar injection. ICPS uses the RL10 engine, and was derived from the Delta Cryogenic Second Stage designed by Japan’s space agency. Aerojet Rocketdyne builds the RS-25 and RL-10 engines.

Starting from Artemis IV, SLS will use the Centaur V upper stage, developed for the Vulcan Centaur, instead of ICPS. NASA previously planned to upgrade SLS from its current Block 1 configuration to a Block 1B and Block 2, but cancelled these plans in February 2026, aiming to standardize on Block 1, to “reduce risk and maintain schedule stability”. Block 1B was to use the Exploration Upper Stage, and Block 2 would have used new solid rocket boosters.

While SLS has the highest liftoff thrust of any rocket to ever carry humans, 39 meganewtons (8,800,000 pounds-force),[c][125] SLS’s payload capacity to trans-lunar injection of 27 metric tons (59,525 lb) is only around half that of the Saturn V’s 48.6 metric tons (107,145 lb) payload.[126][127][128][129] Thus for Artemis lunar landings, beginning with Artemis IV, Orion is planned to dock with the Human Landing System (HLS) in lunar orbit, separately launched on a non-SLS rocket; SpaceX’s Starship HLS and Blue Origin‘s Blue Moon are under development as HLS vehicles.[130]

Beginning from Artemis V, NASA will transfer SLS operations to the Deep Space Transport LLC, a commercial launch provider consortium of Boeing and Northrop Grumman.

SpaceX Starship

The SpaceX Starship system is a fully-reusable super heavy-lift Earth-launch system which is under development. It consists of a first-stage booster named Super-Heavy and a second-stage space vehicle which is generally named Starship and which will have several variants. A Starship HLS mission will use three variants: a tanker, a propellant depot, and the Starship HLS itself which will be designed only for lunar landings and takeoffs, and not for Earth landings. Some variants will be able to return to Earth for reuse.

The second-stage Starships are fully self-contained spacecraft, complete with their own propulsion systems. The combined Starship system using standard Starship variants for its second-stage is planned to launch crews and cargo, which may then be used to support the various developmental needs of the Artemis program, and also to support the needs of other NASA and SpaceX programs.

The SpaceX Starship is also qualified to be bid for Commercial Lunar Payload Services (CLPS) launches, and in 2021 was the winning NASA bid for a crewed lunar landing.[131][132][133]

Space vehicles

Orion

NASA’s Orion spacecraft undergoing final tests

Orion is a class of partially reusable spacecraft to be used in the Artemis program. The spacecraft consists of a Crew Module (CM) space capsule designed by Lockheed Martin and the European Service Module (ESM) manufactured by Airbus Defence and Space. Capable of supporting a crew of six beyond low Earth orbit, Orion is equipped with solar panels, an automated docking system, and glass cockpit interfaces modeled after those used in the Boeing 787 Dreamliner. It has a single AJ10 engine for primary propulsion, and others including reaction control system engines. Although designed to be compatible with other launch vehicles, Orion is primarily intended to launch atop a Space Launch System (SLS) rocket, with a tower launch escape system.

Orion was originally conceived by Lockheed Martin as a proposal for the Crew Exploration Vehicle (CEV) to be used in NASA’s Constellation program. Following the cancellation of the Constellation program in 2010, Orion was heavily redesigned for use in NASA’s Journey to Mars initiative; later named Moon to Mars. The SLS replaced the Ares I as Orion’s primary launch vehicle, and the service module was replaced with a design based on the European Space Agency‘s Automated Transfer Vehicle. A development version of Orion’s CM was launched in 2014 during Exploration Flight Test-1, while at least four test articles were produced. By 2022, three flight-worthy Orion crew modules have been built, with an additional one ordered, for use in the Artemis program; the first of these was due to be launched on November 30, 2020, however, Artemis I did not launch until November 16, 2022.

Lunar Gateway (cancelled)

Rendering of the assembled Lunar Gateway, 2024 design
Gateway design architecture in 2024

The Lunar Gateway was a planned space station that would have been assembled in orbit around the Moon as part of the Artemis program. Derived from earlier concepts such as the Exploration Gateway Platform, it was developed from 2017 until 2026, when the leading space agency NASA shifted focus to developing a lunar surface base. The elements of Gateway are expected to be repurposed for other projects.

The project was developed with international partners including the European Space Agency (ESA),[134] the Japan Aerospace Exploration Agency (JAXA),[135] the Canadian Space Agency (CSA),[136] and the Mohammed Bin Rashid Space Centre (MBRSC) of the United Arab Emirates.[137]

One of the technical drivers for Gateway was the limited propulsion capability of Orion‘s European Service Module used for the Artemis missions, which could not independently depart from low lunar orbit. A near-rectilinear halo orbit was selected, which reduced propulsion requirements.[138] Gateway was intended to serve as a staging point where Orion could rendezvous with Human Landing System lunar landers, transfer crews, and support lunar surface missions. It was also planned to support communications, scientific research, and habitation for both crewed and robotic missions. Before its cancellation, it was expected to be the first space station beyond low Earth orbit and a potential staging point for future human missions to Mars.[139]

Development plans called for two initial modules, the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO). Mid-way through the effort a plan emerged to launch them together on a commercial rocket. Subsequent elements were to be launched on Space Launch System (SLS) missions as co-manifested payloads with Orion and transferred to lunar orbit.

Planned surface operations

An artist’s rendition of an Artemis astronaut wearing the xEMU spacesuit and xPLS life support backpack during an EVA on the Moon

The Artemis Base Camp will support missions of up to two months and will be used to study technologies to use on future Moon or Mars bases, and then future stationary modules may be used regularly for decades to come through both Government and commercial programs. Most probably it will be a site that has already been visited by prior robotic missions. It will consist of three main modules:

  1. The Surface Habitat (SH) modules, which is the initial dwelling structure and a surface home base for the first residents of the Moon.
  2. The Lunar Terrain Vehicle (LTV), which is an unpressurized rover cart for transporting suited astronauts and cargo around in the vicinity of the Base.
  3. The Pressurized Rovers (PR), a pressurized vehicle complete with small backup habitation facilities, thus enabling multi-day and longer-range explorations tens of kilometers away from the Base.[140]

Transportation on the Moon

Landing zone

In 2022, NASA identified 13 candidate regions near the lunar South Pole for initial landing and inspection missions.[141]

Ground transportation development

NASA’s baseline Lunar Terrain Vehicle

In February 2020, NASA released two requests for information regarding both a crewed and uncrewed unpressurized surface rover. The latter, Lunar Terrain Vehicle (LTV) would be prepositioned by a CLPS vehicle before the Artemis III mission. It would be used to transport crews around the exploration site and serve a similar function to the Apollo Lunar Roving Vehicle. In July 2020, NASA established a program office for the rover at the Johnson Space Center in Houston.[142]

NASA has specified its need for a Lunar Terrain Vehicle (LTV) that has a cargo capacity of 800 kg, traversal distances of up to 20 km without battery recharging, continuous operations for 8 hours within a 24-hour period, the ability to survive the lunar night, and the ability to traverse grades as steep as ±20 degrees.[140]

On April 3, 2024, NASA announced that Intuitive Machines, Lunar Outpost and Venturi Astrolab are the three companies developing the LTV in a 12-month feasibility and demo phase.[143] A source selection statement by NASA provided further details on cost and overall feasibility on April 9, 2024. The Intuitive Machines proposal was for $1.692 billion, Lunar Outpost for $1.727 billion and Astrolab for $1.928 billion to develop the vehicle.[144]

Shelter building construction

Artist’s impression of Artemis Base Camp

The Artemis Base Camp is the proposed lunar base to be established at the end of the 2020s. The Base camp is to be in the south pole region near the two adjacent Shackleton and de Gerlache craters,[145] due to this area’s wide variety of lunar geography and also due to the abundance of water ice that is believed to exist in the lunar soils of the crater floors. The environs of these craters fall under the guidelines of the Outer Space Treaty.[142][146]

Foundational Surface Habitat

A render of the Foundational Surface Habitat (stationary configuration)

Most of the information about the Surface Habitat (SH) modules comes from studies and launch manifests which include a reference to its launch. It will be commercially built and commercially launched in the early 2030s along with the Pressurized Vehicle (PV).[147] The SH was formerly referred to as the Artemis Surface Asset. Launch plans as of February 2020 showed that landing it on the surface would be similar to the HLS. The SH would be sent to the Gateway where it would then be attached to a descent stage and subsequently transported to the lunar surface with a commercial launcher and lander. It would use the same lunar transfer stage as used for the HLS. Other designs from 2019 envisioned it being launched from an SLS Block 1B as a single unit and landing directly on the surface. It would then be hooked up to a surface power system launched by a CLPS mission and tested by the Artemis VI crew.[142][148] The Italian Space Agency signed a contract with Thales Alenia Space in late 2023 for the Multi Purpose Habitation module, which may become the second module for the Artemis Base Camp.[149][150]

Resource prospecting and research programs

As of February 2020, a lunar stay during a Phase 1 Artemis mission will be about seven days and will have five extravehicular activities (EVA). A notional concept of operations, i.e., a hypothetical but possible plan, would include the following: On Day 1 of the stay, astronauts touchdown on the Moon but do not conduct an EVA. Instead, they prepare for the EVA scheduled for the next day, in what is referred to as “The Road to EVA”.[151]

On Day 2, the astronauts open the hatch on the Human Landing System and embark on EVA 1, which will be six hours long. It will include collecting a contingency sample, conducting public affairs activities, deploying the experiment package, and acquiring samples. The astronauts will stay close to the landing site on this first EVA. EVA 2 begins on day 3. The astronauts characterize and collect samples from permanently shadowed regions. Unlike the previous EVA, the astronauts will go farther from the landing site, up to 2 kilometres (1.2 mi), and up and down slopes of 20°.[151]

Day 4 will not include an EVA, but Day 5 will. EVA 3 may include activities such as collecting samples from an ejecta blanket. Day 6 will have the two astronauts deploy a geotechnical instrument alongside an environmental monitoring station for in-situ resource utilization (ISRU). Day 7 will have the final and shortest EVA. This EVA will last one hour, rather than the others’ six hours in duration from egress to ingress, and mostly comprises preparations for the lunar ascent, including jettisoning hardware. Once the final EVA is concluded, the astronauts will return to the Human Landing System and the vehicle will launch from the surface and join up with Orion/Gateway.[151]

Pressurized rover (“Mobile Habitat”)

NASA Habitable Mobility Platform based on the past Constellation Space Exploration Vehicle

The Pressurized Rover (PR) is a large, pressurized module used to enable crewed operation across large distances and live for multiple days. NASA had developed multiple pressurized rovers including what was formerly called the Space Exploration Vehicle (SEV). This rover was built for the Constellation program and was fabricated and then tested. In the 2020 flight manifest it was later referred to as the “Mobile Habitat” suggesting it could fill a similar role to the ILREC Lunar Bus. It would be ready for the crew to use on the surface but could also be autonomously controlled from the Gateway or other locations.

In regard to the PR, senior-lunar-scientist Clive Neal said “Under Constellation, NASA had a sophisticated rover put together. It’s pretty sad if it’s never going to get to the Moon”. However Neal also said that he understands the different mission objectives between the Constellation Program and those of the Artemis Program, and the need of the Artemis Program to focus more on international collaboration.[142][152][153][154][155]

On April 9, 2024, it was announced that JAXA and NASA had signed an agreement stipulating that Japan would join the pressurized rover collaboration venture and would design, develop, and operate a rover for crewed and uncrewed exploration of the Moon. In return, NASA will provide the launch and delivery of the rover to the Moon, as well as providing seats for two Japanese astronaut missions to the lunar surface, with the goal of these astronauts being the first non-Americans to travel to the Moon’s surface. The pressurized rover is planned to accommodate two astronauts for up to 30 days outside. NASA plans to use the pressurized rover from Artemis VII and subsequent missions, over an approximate 10 year lifespan.[156]

Spacesuits

Christina Koch in the OCSS (Orion Crew Survival System)
Jenni Gibbons tests the AxEMU (Axiom Extravehicular Mobility Unit)

The Artemis program uses two types of space suit first unveiled in October 2019: the Orion Crew Survival System (OCSS) for launch and entry,[157] and a next-generation extravehicular mobility unit (EMU) for lunar surface operations.[158]

The OCSS, developed by the David Clark Company, functions as a contingency safety system for the Orion spacecraft, providing pressurized life support for up to 144 hours in the event of cabin depressurization.[159][160] The suits are primarily colored international orange, a high-visibility shade used to aid recovery operations by improving visibility against ocean and sky backgrounds. Each suit is custom-fitted and incorporates flotation devices for post-splashdown survival.[161]

Development of NASA’s Exploration Extravehicular Mobility Unit (xEMU) encountered delays; a 2021 audit by the NASA Office of Inspector General found it would not be ready before 2025.[162] In response, NASA shifted to a commercial services model and selected Axiom Space and Collins Aerospace in 2022 to develop lunar spacesuits.[163] Collins later withdrew from the contract in 2024.[164]

Development has since focused on the Axiom Extravehicular Mobility Unit (AxEMU), which entered critical design review and testing in 2024.[165][166] By February 2026, the suit had passed internal reviews and was undergoing further evaluation by NASA, with assembly of the first flight unit underway following pressurized and underwater mobility testing at the Neutral Buoyancy Laboratory.[167]

Criticism

The Artemis program has received criticism from several space professionals. Mark Whittington, who is a contributor to The Hill and an author of several space exploration studies, stated in an article that the “lunar orbit project doesn’t help us get back to the Moon”.[168]

Aerospace engineer, author, and Mars Society founder Robert Zubrin disliked the Lunar Gateway component of Artemis prior to its cancellation. He presented an alternative approach to a 2024 crewed lander called “Moon Direct”, a proposed successor to his Mars Direct. Zubrin envisions phasing out the SLS and Orion, replacing them with the SpaceX launch vehicles and the SpaceX Dragon 2. This would see ferry-lander refueling on the lunar surface via in situ resource utilization with crew transfer from LEO to the lunar surface. The concept resembles NASA’s own Space Transportation System proposal from the 1970s.[169]

At least 15 launches will be required to refuel HLS in orbit per crewed mission.[170] In 2024, SpaceX’s Jennifer Jensen stated on a call that Starship HLS will require ten launches.[171] Apollo 11 astronaut Buzz Aldrin disagrees with NASA’s lunar outpost plan. He questioned the benefit of NASA to “send a crew to an intermediate point in space, pick up a lander there and go down.” Aldrin has expressed support for Zubrin’s “Moon Direct”.[172]

See also

Notes

  1. ^ An Orion capsule was flown in 2014, but not the entire Orion spacecraft.
  2. ^ Director General Josef Aschbacher stated one of the seats is reserved for the European Space Agency.[63][64]
  3. ^ Director General Josef Aschbacher stated two of the seats are reserved for the European Space Agency.[64][63]
  1. ^ requires refueling in LEO
  2. ^ Per launch. May require refueling launches
  3. ^ The Soviet N-1 rocket produced 45.7 MN and was also designed to carry humans to the Moon, but was never flown manned. SpaceX Starship is also planned to carry humans, and has demonstrated liftoff thrust exceeding 70 MN.[citation needed]

References

  1. ^ a b NASA Office of Inspector General (November 15, 2021). NASA’s Management of the Artemis Missions (PDF) (Report). NASA. p. 21. Retrieved January 18, 2023. To account for all Artemis costs for FYs 2021 through 2025, including Phase 2 projects like the SLS Block 1B, Mobile Launcher 2, and Gateway, we found that $25 billion should be added to the Artemis Plan’s estimated costs, increasing the total costs over this 5-year period to $53 billion. Furthermore, when considering the $40 billion already spent on the Artemis mission from FYs 2012 to 2020, the total projected cost through FY 2025 becomes $93 billion.
  2. ^ a b c Public Domain One or more of the preceding sentences incorporates text from this source, which is in the public domain: “NASA: Moon to Mars”. nasa.gov. NASA. Archived from the original on August 5, 2019. Retrieved May 19, 2019.
  3. ^ Artemis I Launch to the Moon (Official NASA Broadcast) – Nov. 16, 2022, November 16, 2022, retrieved November 16, 2022
  4. ^ a b c d “NASA Prepares Rocket, Spacecraft Ahead of Tropical Storm Nicole, Re-targets Launch”. NASA. November 8, 2022. Retrieved November 9, 2022.
  5. ^ “Orion Components”, NASA, February 27, 2024, retrieved June 18, 2024
  6. ^ Gebhardt, Chris (April 6, 2017). “NASA finally sets goals, missions for SLS — multi-step plan to Mars”. NASASpaceFlight.com. Archived from the original on August 21, 2017. Retrieved August 21, 2017.
  7. ^ NASA (November 17, 2022). “Gateway: overview”. NASA. Retrieved March 6, 2023.
  8. ^ a b Grush, Loren (July 18, 2019). “NASA’s daunting to-do list for sending people back to the Moon”. The Verge. Archived from the original on December 7, 2019. Retrieved August 28, 2019.
  9. ^ “Lunar Codex: digitised works of 30,000 artists to be archived on moon”. The Guardian. August 1, 2023. ISSN 0261-3077. Retrieved March 29, 2026.
  10. ^ Foust, Jeff (March 13, 2023). “NASA planning to spend up to $1 billion on space station deorbit module”. SpaceNews. Retrieved March 13, 2023.
  11. ^ Foust, Jeff (October 30, 2022). “Lunar landing restored for Artemis 4 mission”. SpaceNews. Retrieved October 31, 2022.
  12. ^ “FY 2025 Budget Request | FY 2025 President’s Budget Request Moon to Mars Manifest” (PDF). NASA. April 15, 2024. p. 6. Retrieved July 31, 2024.
  13. ^ a b c d e f g Warner, Cheryl (March 3, 2026). “NASA Strengthens Artemis: Adds Mission, Refines Overall Architecture”. NASA. Retrieved March 3, 2026.
  14. ^ Clark, Stephen (May 18, 2020). “NASA will likely add a rendezvous test to the first piloted Orion space mission”. Spaceflight Now. Archived from the original on July 8, 2020. Retrieved May 19, 2020.
  15. ^ Berger, Eric (January 9, 2026). “Is Orion’s heat shield really safe? New NASA chief conducts final review on eve of flight”. Ars Technica. Retrieved January 27, 2026.
  16. ^ a b c Smith, Marcia (January 9, 2024). “NASA Delays Next Artemis Missions to 2025 and 2026”. SpacePolicyOnline. Retrieved January 10, 2024.
  17. ^ “NASA Shares Orion Heat Shield Findings, Updates Artemis Moon Missions – NASA”. Retrieved December 5, 2024.
  18. ^ Clark, Stephen (February 21, 2026). “NASA says it needs to haul the Artemis II rocket back to the hangar for repairs”. Ars Technica. Retrieved February 24, 2026.
  19. ^ Isaacman, Jared [@NASAAdmin] (March 3, 2026). “Endeavoring for not just one, but TWO Moon landings in 2028. Coming weeks: Artemis II around the Moon. Mid-2027: Artemis III rendezvousing with one or both HLS providers, testing space suits in low Earth orbit. Early 2028: Artemis IV lunar landing. Late 2028: Artemis V lunar landing, beginning work on lunar base. This is how we get back to the Moon with urgency, to stay” (Tweet). Retrieved March 3, 2026 – via X (formerly Twitter).
  20. ^ Foust, Jeff (July 21, 2019). “NASA outlines plans for lunar lander development through commercial partnerships”. SpaceNews. Retrieved July 17, 2020.
  21. ^ Moskowitz, Clara (January 7, 2011). “NASA Stuck in Limbo as New Congress Takes Over”. Space.com. Archived from the original on October 22, 2020. Retrieved October 19, 2020.
  22. ^ Public Domain One or more of the preceding sentences incorporates text from this source, which is in the public domain: Bonilla, Dennis (September 8, 2009). “Charter of the Review of U.S. Human Space Flight Plans Committee”. NASA. Archived from the original on April 8, 2021. Retrieved September 9, 2009.
  23. ^ Amos, Jonathan (October 11, 2010). “Obama signs Nasa up to new future”. BBC News. Archived from the original on September 26, 2020. Retrieved September 30, 2020.
  24. ^ Public Domain One or more of the preceding sentences incorporates text from this source, which is in the public domain: Review of U.S. Human Space Flight Plans Committee; Augustine; Austin; Chyba; et al. “Seeking A Human Spaceflight Program Worthy of A Great Nation” (PDF). Final Report. NASA. Archived (PDF) from the original on February 16, 2019. Retrieved April 15, 2010.
  25. ^ Public Domain One or more of the preceding sentences incorporates text from this source, which is in the public domain: “President Barack Obama on Space Exploration in the 21st Century”. NASA. Archived from the original on December 14, 2017. Retrieved September 1, 2019.
  26. ^ Public Domain One or more of the preceding sentences incorporates text from this source, which is in the public domain: “S.3729 – National Aeronautics and Space Administration Authorization Act of 2010”. United States Congress. October 11, 2010. Archived from the original on April 28, 2021. Retrieved January 9, 2020.
  27. ^ Clark, Stephen (June 30, 2017). “Trump signs order reviving long-dormant National Space Council”. Spaceflight Now. Archived from the original on November 9, 2020. Retrieved June 30, 2017.
  28. ^ Grush, Loren (May 17, 2019). “NASA administrator on new Moon plan: “We’re doing this in a way that’s never been done before”. The Verge. Archived from the original on July 4, 2020. Retrieved May 20, 2019.
  29. ^ Pearlman, Robert (May 14, 2019). “NASA Names New Moon Landing Program Artemis After Apollo’s Sister”. Space.com. Archived from the original on July 26, 2019. Retrieved May 14, 2019.
  30. ^ Grush, Loren (May 17, 2019). “NASA administrator on new Moon plan: “We’re doing this in a way that’s never been done before”. The Verge. Archived from the original on July 4, 2020. Retrieved May 20, 2019.
  31. ^ Chang, Kenneth (May 13, 2019). “For Artemis Mission to Moon, NASA Seeks to Add Billions to Budget”. The New York Times. ISSN 0362-4331. Archived from the original on May 25, 2019. Retrieved July 21, 2019.
  32. ^ Harwood, William (July 17, 2019). “NASA boss pleads for steady moon mission funding”. CBS News. Archived from the original on November 12, 2020. Retrieved August 28, 2019.
  33. ^ “Senate appropriators advance bill funding NASA despite uncertainties about Artemis costs”. SpaceNews. September 27, 2019. Retrieved June 26, 2022.
  34. ^ Fernholz, Tim (May 14, 2019). “Trump wants US$1.6 billion for a Moon mission and proposes to get it from college aid”. Quartz. Archived from the original on November 8, 2020. Retrieved May 14, 2019.
  35. ^ Berger, Eric (May 14, 2019). “NASA reveals funding needed for Moon program, says it will be named Artemis”. Ars Technica. Archived from the original on July 27, 2019. Retrieved May 22, 2019.
  36. ^ Berger, Eric (February 11, 2020). “NASA puts a price on a 2024 Moon landing – US$35 billion”. Ars Technica. Archived from the original on February 11, 2020. Retrieved February 11, 2020.
  37. ^ Public Domain One or more of the preceding sentences incorporates text from this source, which is in the public domain: “Appropriations Committee Releases Fiscal Year 2021 Commerce-Justice-Science Funding Bill”. House Committee on Appropriations – Republicans. July 7, 2020. Archived from the original on August 5, 2020. Retrieved August 7, 2020.
  38. ^ “House bill offers flat funding for NASA”. SpaceNews. July 7, 2020. Archived from the original on July 12, 2020. Retrieved September 30, 2020.
  39. ^ Burghardt, Thomas (May 1, 2020). “NASA Selects Blue Origin, Dynetics, and SpaceX Human Landers for Artemis”. NASASpaceFlight.com. Archived from the original on May 15, 2020. Retrieved June 12, 2020.
  40. ^ Berger, Eric (April 30, 2020). “NASA awards lunar lander contracts to Blue Origin, Dynetics and Starship”. Ars Technica. Archived from the original on May 13, 2020. Retrieved June 12, 2020.
  41. ^ Public Domain One or more of the preceding sentences incorporates text from this source, which is in the public domain: Potter, Sean (April 30, 2020). “NASA Names Companies to Develop Human Landers for Artemis Missions”. nasa.gov. NASA. Archived from the original on May 11, 2020. Retrieved June 12, 2020.
  42. ^ “White House endorses Artemis program”. SpaceNews. February 4, 2021. Retrieved April 29, 2021.
  43. ^ “Press Briefing by Press Secretary Jen Psaki and National Security Advisor Jake Sullivan, February 4, 2021”. whitehouse.gov. February 4, 2021. Archived from the original on March 11, 2021. Retrieved March 19, 2021.
  44. ^ Rincon, Paul (February 5, 2021). “Artemis: Biden administration backs US Moon shot”. BBC News Online. Archived from the original on March 16, 2021. Retrieved March 19, 2021.
  45. ^ Davenport, Christian (March 2, 2021). “The Biden administration has set out to dismantle Trump’s legacy, except in one area: Space”. The Washington Post. Archived from the original on April 28, 2021. Retrieved March 19, 2021.
  46. ^ Bartels, Meghan (February 5, 2021). “NASA has a lot to tackle this year as Biden takes charge. Here’s what the agency’s acting chief has to say”. Space.com. Archived from the original on March 2, 2021. Retrieved March 20, 2021.
  47. ^ Feldscher, Jacqueline (February 16, 2021). “NASA reassesses Trump’s 2024 moon goal”. Politico. Archived from the original on March 2, 2021. Retrieved March 20, 2021.
  48. ^ Berger, Eric (February 18, 2021). “Acting NASA chief says 2024 Moon landing no longer a “realistic” target”. Ars Technica. Archived from the original on March 4, 2021. Retrieved March 20, 2021.
  49. ^ Berger, Eric (April 16, 2021). “NASA selects SpaceX as its sole provider for a lunar lander – “We looked at what’s the best value to the government.”. Ars Technica. Archived from the original on April 17, 2021. Retrieved April 17, 2021.
  50. ^ “Blue Origin protests NASA Human Landing System award”. SpaceNews. April 26, 2021. Retrieved April 28, 2021.{{cite news}}: CS1 maint: deprecated archival service (link)
  51. ^ “Dynetics protests NASA HLS award”. SpaceNews. April 27, 2021. Retrieved April 28, 2021.{{cite news}}: CS1 maint: deprecated archival service (link)
  52. ^ Foust, Jeff (July 30, 2021). “GAO denies Blue Origin and Dynetics protests of NASA lunar lander contract”. SpaceNews. Retrieved August 2, 2021.
  53. ^ “Jeff Bezos’ Blue Origin sues NASA, escalating its fight for a Moon lander contract”. The Verge. August 16, 2021. Archived from the original on August 16, 2021. Retrieved August 16, 2021. protest prevented SpaceX from starting its contract for 95 days while the GAO adjudicated the case.
  54. ^ Sheetz, Michael (August 16, 2021). “Bezos’ Blue Origin takes NASA to federal court over award of lunar lander contract to SpaceX”. CNBC. Archived from the original on August 16, 2021. Retrieved August 16, 2021.
  55. ^ Sheetz, Michael (November 4, 2021). “Bezos’ Blue Origin loses NASA lawsuit over SpaceX $2.9 billion lunar lander contract”. CNBC. Retrieved November 4, 2021.
  56. ^ “NASA awards US$45.5 million to 11 American companies to “advance human lunar landers”. mlive.com. May 22, 2019. Archived from the original on July 26, 2020. Retrieved March 24, 2022.
  57. ^ “NASA Selects Five U.S. Companies to Mature Artemis Lander Concepts”. NASA. September 14, 2021. Archived from the original on September 15, 2021. Retrieved March 24, 2022.
  58. ^ McGuinness, Jackie; Russell, Jimi; Sudnik, Janet; Potter, Sean (March 23, 2022). “NASA Provides Update to Astronaut Moon Lander Plans Under Artemis”. NASA. Retrieved March 24, 2022.
  59. ^ Wall, Mike (March 23, 2022). “NASA wants another moon lander for Artemis astronauts, not just SpaceX’s Starship”. Space.com. Retrieved March 24, 2022.
  60. ^ a b Wattles, Jackie (November 8, 2022). “NASA’s Artemis I mission delayed again as storm barrels toward launch site”. CNN. Warner Bros Discovery. Retrieved November 9, 2022.
  61. ^ “NASA: Artemis I”. NASA. Retrieved November 16, 2022.
  62. ^ “Artemis II”. NASA. Retrieved July 11, 2024.
  63. ^ a b Pultarova, Tereza. “1st European to fly to the moon will be German”. Space.com. Retrieved December 30, 2025.
  64. ^ a b Howell, Elizabeth. “Artemis 4 and Artemis 5 moon missions will include European astronauts (exclusive interview)”. Space.com. Retrieved December 30, 2025.
  65. ^ “Orion Reference Guide” (PDF). NASA. November 10, 2022. pp. 46–50. Retrieved April 7, 2026.
  66. ^ Sloss, Philip (May 24, 2019). “NASA Orion AA-2 vehicle at the launch pad for July test”. NASASpaceFlight.com. Archived from the original on May 25, 2019. Retrieved May 25, 2019. This will be the second and final planned LAS test following the Pad Abort-1 (PA-1) development test conducted in 2010 as a part of the ccanceled [sic] Constellation Program and the abort system design changed from PA-1 to AA-2 both inside and outside […] in preparation for a scheduled daybreak test on 2 July 2010.
  67. ^ “Image: The Orion test crew capsule”. Phys.org. August 3, 2018. Retrieved October 17, 2018. In the Ascent Abort-2 test, NASA will verify that the Orion spacecraft’s launch abort system can steer the capsule and astronauts inside it to safety in the event of an issue with the Space Launch System rocket when the spacecraft is under the highest aerodynamic loads it will experience during ascent…{{cite web}}: CS1 maint: deprecated archival service (link)
  68. ^ a b “NASA’s Ascent Abort-2 Flight Test Successfully Completed”. NASA. July 2, 2019. Retrieved November 10, 2022.
  69. ^ Orbital Sciences Corporation (April 11, 2007). “Orbital to Provide Abort Test Booster for NASA Testing”. Northrop Grumman. Archived from the original on May 25, 2019. Retrieved May 25, 2019. Orbital Sciences Corporation (NYSE:ORB) today announced that it has been selected […] to design and build the next-generation NASA Orion Abort Test Booster (ATB).
  70. ^ Davis, Jason (December 5, 2014). “Orion Returns to Earth after Successful Test Flight”. The Planetary Society. Archived from the original on May 25, 2019. Retrieved May 25, 2019. NASA’s Orion spacecraft returned safely to Earth this morning following a picture-perfect test mission. […] Orion itself was originally part of NASA’s now-defunct Constellation program, and is now a key component of the space agency’s Mars plans.
  71. ^ Clark, Stuart; Sample, Ian; Yuhas, Alan (December 5, 2014). “Orion spacecraft’s flawless test flight puts Mars exploration one step closer”. The Guardian. Archived from the original on May 25, 2019. Retrieved May 25, 2019. The launch at 12.05 UTC aboard a Delta IV heavy rocket from Cape Canaveral, Florida, was as free of problems as Thursday’s aborted attempt was full of them. Immediately, Nasa tweeted “Liftoff! #Orion’s flight test launches a critical step on our #JourneytoMars”.
  72. ^ Kramer, Miriam (December 5, 2014). “Splashdown! NASA’s Orion Spaceship Survives Epic Test Flight as New Era Begins”. Space.com. Retrieved October 17, 2018. Orion’s key systems were put to the test during the flight, which launched atop a United Launch Alliance Delta 4 Heavy rocket […] the craft hit Earth’s atmosphere as the capsule was flying through space at about 20,000 mph (32,000 km/h).{{cite web}}: CS1 maint: deprecated archival service (link)
  73. ^ “Orion Exploration Flight Test No. 1 timeline”. Spaceflight Now. December 4, 2014. Archived from the original on December 9, 2014. Retrieved October 17, 2018. The first orbital test flight of NASA’s Orion crew capsule will lift off on top of a United Launch Alliance Delta 4 rocket from Cape Canaveral’s Complex 37B launch pad. The rocket will send the unmanned crew module 3,600 miles above Earth…
  74. ^ Clark, Stephen (April 26, 2022). “NASA’s moon rocket rolls back to Vehicle Assembly Building for repairs”. Spaceflight Now. Retrieved April 26, 2022.
  75. ^ Kraft, Rachel (September 3, 2022). “Artemis I Launch Attempt Scrubbed”. NASA blog. NASA. Retrieved September 3, 2022.
  76. ^ “NASA Sets Date for Next Launch Attempt for Artemis I Moon Mission”. NASA. October 12, 2022. Retrieved October 13, 2022.
  77. ^ Witze, Alexandria (November 16, 2022). “Lift off! Artemis Moon rocket launch kicks off new era of human exploration – NASA’s Artemis I has entered Earth orbit. It will test a rocket and capsule that could return astronauts to the Moon after 50 years”. Nature. 611 (7937): 643–644. doi:10.1038/d41586-022-02310-w. PMID 36385285. S2CID 253579417.
  78. ^ “Splashdown! NASA’s Orion Returns to Earth After Historic Moon Mission”. www.nasa.gov.uk. NASA. December 11, 2022. Retrieved December 11, 2022.
  79. ^ Dinner, Josh (March 31, 2026). “Here’s what the Artemis 2 astronauts will be doing on each day of NASA’s historic moon mission”. Space. Retrieved April 14, 2026.
  80. ^ Foust, Jeff (March 13, 2023). “NASA planning to spend up to $1 billion on space station deorbit module”. SpaceNews. Retrieved March 13, 2023.
  81. ^ Berger, Eric (April 19, 2024). “NASA may alter Artemis III to have Starship and Orion dock in low Earth orbit”. Ars Technica. Retrieved July 6, 2024.
  82. ^ “Artemis IV”. nasa.gov. Retrieved April 4, 2026.
  83. ^ Warner, Cheryl (March 3, 2026). “NASA Strengthens Artemis: Adds Mission, Refines Overall Architecture”. NASA. Retrieved March 3, 2026.
  84. ^ Foust, Jeff (October 30, 2022). “Lunar landing restored for Artemis 4 mission – SpaceNews”. SpaceNews. Retrieved April 5, 2026.{{cite web}}: CS1 maint: url-status (link)
  85. ^ Cameron, Claire. “NASA scraps 2027 Artemis III moon landing in favor of 2028 mission”. Scientific American. Retrieved April 7, 2026.
  86. ^ Warner, Cheryl (March 3, 2026). “NASA Strengthens Artemis: Adds Mission, Refines Overall Architecture”. NASA. Retrieved March 3, 2026.
  87. ^ Foust, Jeff (January 20, 2022). “NASA foresees gap in lunar landings after Artemis 3”. SpaceNews. Retrieved February 2, 2022.
  88. ^ Harwood, William (May 31, 2019). “NASA moon landing: Space agency taps 3 companies for Artemis program moon missions – Astrobotic, Intuitive Machines, and Orbit Beyond”. www.cbsnews.com. Retrieved May 14, 2024.
  89. ^ Foust, Jeff (May 31, 2019). “NASA awards contracts to three companies to land payloads on the moon”. Space News. Retrieved November 26, 2022.
  90. ^ “NASA Expands Plans for Moon Exploration: More Missions, More Science”. NASA. April 30, 2018. Archived from the original on February 16, 2020. Retrieved June 4, 2018.
  91. ^ a b “Draft Commercial Lunar Payload Services – CLPS solicitation”. Federal Business Opportunities. NASA. Archived from the original on October 8, 2018. Retrieved June 4, 2018.
  92. ^ https://payloadspace.com/clps-companies-excited-for-nasas-opportunity-bomb-lunar-plan/
  93. ^ Foust, Jeff (October 13, 2020). “Eight countries sign Artemis Accords”. SpaceNews. Archived from the original on June 15, 2024. Retrieved February 27, 2024.
  94. ^ “Artemis Accords”. NASA. Archived from the original on June 15, 2024. Retrieved February 27, 2024.
  95. ^ Taveau, Jessica (January 26, 2025). “NASA Welcomes Oman as Newest Artemis Accords Signatory”. NASA. Retrieved January 26, 2025.
  96. ^ “NASA: Artemis Accords”. NASA. Archived from the original on May 16, 2020. Retrieved May 1, 2021.
  97. ^ a b Potter, Sean (October 13, 2020). “NASA, International Partners Advance Cooperation with Artemis Accords”. NASA. Archived from the original on February 19, 2021. Retrieved May 1, 2021.
  98. ^ “Fact Sheet: Artemis Accords – United for Peaceful Exploration of Deep Space”. U.S. Embassy & Consulates in Brazil. October 20, 2020. Archived from the original on March 6, 2022. Retrieved May 1, 2021.
  99. ^ Newman, Christopher (October 19, 2020). “Artemis Accords: why many countries are refusing to sign Moon exploration agreement”. The Conversation. Archived from the original on June 25, 2022. Retrieved June 17, 2021.
  100. ^ “The Artemis Accords and the Future of International Space Law”. ASIL. Archived from the original on June 25, 2022. Retrieved June 17, 2021.
  101. ^ Except the Moon Treaty, despite Australia having ratified it. The Moon Treaty only has 17 State Parties, none of which has engaged in self-launched human spaceflight.
  102. ^ “NASA, International Partners Advance Cooperation with First Signings of Artemis Accords”. NASA. October 13, 2020. Archived from the original on October 15, 2020. Additional countries will join the Artemis Accords in the months and years ahead, as NASA continues to work with its international partners to establish a safe, peaceful, and prosperous future in space. Working with emerging space agencies, as well as existing partners and well-established space agencies, will add new energy and capabilities to ensure the entire world can benefit from the Artemis journey of exploration and discovery.
  103. ^ Howell, Elizabeth (August 25, 2022). “Artemis Accords: Why the international moon exploration framework matters”. Space.com. Archived from the original on November 7, 2022. Retrieved November 6, 2022.
  104. ^ “Exploration Ground Systems”. NASA. August 21, 2018. Retrieved October 10, 2018.
  105. ^ “Exploration Ground Systems Overview”. NASA. June 20, 2018. Retrieved October 19, 2018.
  106. ^ “Exploration Ground Systems, Jacobs practice building SLS boosters in the VAB”. NASASpaceFlight.com. April 17, 2018. Retrieved February 26, 2019.
  107. ^ Berger, Eric (May 31, 2019). “NASA picks three companies to attempt Moon landings in 2020 and 2021”. Ars Technica. Archived from the original on February 15, 2020. Retrieved December 17, 2019.
  108. ^ Sheetz, Michael (April 30, 2020). “NASA awards contracts to Jeff Bezos and Elon Musk to land astronauts on the Moon”. cnbc.com. Archived from the original on April 30, 2020. Retrieved April 30, 2020.
  109. ^ Barensky, Stefan (July 24, 2019). “Airbus propose un remorqueur translunaire”. Aerospatium (in French). Archived from the original on October 7, 2019. Retrieved January 10, 2020.
  110. ^ Sloss, Philip (September 11, 2018). “NASA updates Lunar Gateway plans”. NASASpaceFlight.com. Retrieved October 17, 2018.{{cite web}}: CS1 maint: deprecated archival service (link)
  111. ^ “Artemis Programs: NASA Should Document and Communicate Plans to Address Gateway’s Mass Risk”. GAO. July 31, 2024. Retrieved July 31, 2024.
  112. ^ “NASA, Northrop Grumman Finalize Moon Outpost Living Quarters Contract”. NASA (Press release). July 9, 2021. Archived from the original on July 9, 2021. Retrieved July 9, 2021.
  113. ^ “NASA Awards Contract to Launch Initial Elements for Lunar Outpost”. NASA (Press release). February 9, 2021. Archived from the original on February 9, 2021. Retrieved February 9, 2021.
  114. ^ a b c Gebhardt, Chris (June 17, 2019). “NASA determining the best course for commercial Lunar Gateway resupply”. NASASpaceFlight.com. Retrieved August 28, 2019.
  115. ^ Public Domain One or more of the preceding sentences incorporates text from this source, which is in the public domain: Aguiar, Laura (June 14, 2019). “NASA to Partner with American Industry to Supply Artemis Moon Missions” (Press release). NASA. Archived from the original on August 21, 2019. Retrieved August 28, 2019.
  116. ^ Public Domain One or more of the preceding sentences incorporates text from this source, which is in the public domain: Potter, Sean (March 27, 2020). “NASA Awards Artemis Contract for Gateway Logistics Services”. NASA. Archived from the original on March 27, 2020. Retrieved March 28, 2020.
  117. ^ Weitering, Hanneke (May 23, 2019). “NASA Has a Full Plate of Lunar Missions Before Astronauts Can Return to Moon”. Space.com. Archived from the original on May 25, 2019. Retrieved August 28, 2019. And before NASA sends astronauts to the moon in 2024, the agency will first have to launch five aspects of the Gateway, all of which will be commercial vehicles that launch separately and join each other in lunar orbit. First, a power and propulsion element will launch in 2022. Then, the crew module will launch (without a crew) in 2023. In 2024, during the months leading up to the crewed landing, NASA will launch the last critical components: a transfer vehicle that will ferry landers from the Gateway to a lower lunar orbit, a descent module that will bring the astronauts to the lunar surface, and an ascent module that will bring them back up to the transfer vehicle, which will then return them to the Gateway.
  118. ^ Smith, Marcia (May 26, 2021). “Nelson: “Watch the Chinese”. SpacePolicyOnline.com. Archived from the original on May 26, 2021. Retrieved May 26, 2021.
  119. ^ “Blue Origin wins lion’s share of NASA funding for human-rated lunar lander”. spaceflightnow.com. Spaceflight Now. April 30, 2020. Archived from the original on May 1, 2020. Retrieved April 30, 2020.
  120. ^ Foust, Jeff (March 13, 2019). “NASA considering flying Orion on commercial launch vehicles”. Space News. Retrieved November 11, 2022.
  121. ^ Berger, Eric (April 8, 2024). “Elon Musk just gave another Mars speech—this time the vision seems tangible”. Ars Technica. Retrieved December 31, 2024.
  122. ^ Wall, Mike (November 19, 2019). “SpaceX’s Starship May Fly for Just $2 Million Per Mission, Elon Musk Says”. Space.com. Archived from the original on July 17, 2020. Retrieved June 19, 2020.
  123. ^ Foust, Jeff (April 20, 2023). “Starship lifts off on first integrated test flight, breaks apart minutes later”. SpaceNews. Archived from the original on November 19, 2023. Retrieved April 26, 2023.
  124. ^ “Blue Origin launches New Glenn rocket from Cape Canaveral Space Force Station in Florida”. Florida Today. Retrieved January 16, 2025.
  125. ^ Sauers, Elisha (January 17, 2026). “Is SLS still the most powerful rocket? 5 facts as Artemis 2 rolls out”. Mashable. Retrieved April 15, 2026.
  126. ^ “Space Launch System (SLS) Fact Sheet” (PDF). NASA. Retrieved April 7, 2026.
  127. ^ “SLS Space Launch System Secondary Payloads”. NASA. Retrieved April 7, 2026.
  128. ^ Heavy-Lift Launch Vehicle Capability (PDF) (Report). NASA. Retrieved April 7, 2026.
  129. ^ Creech, Steve (January 1, 2010). Progress on Enabling Unprecedented Payloads for Space in the 21st Century. 2010 IEEE Aerospace Conference.
  130. ^ “Artemis mission plan”.
  131. ^ As Artemis Moves Forward, NASA Picks SpaceX to Land Next Americans on Moon NASA. Apr 16, 2021. By Monica Witt. Retrieved 2023-04-16.
  132. ^ “SpaceX”. SpaceX. Retrieved December 12, 2022.
  133. ^ “Starship Users Guide V1.0” (PDF). SpaceX. March 2020. Archived from the original (PDF) on November 18, 2022.
  134. ^ “Gateway”. www.esa.int. European Space Agency. Retrieved January 19, 2026.
  135. ^ M. Etkind; J. McGuinness (November 17, 2022). “NASA, Japan Announce Gateway Contributions, Space Station Extension”. www.nasa.gov (Press release). NASA. Retrieved January 19, 2026.
  136. ^ “Canada begins detailed design, construction and testing of Canadarm3 for Gateway”. www.canada.ca. Canadian Space Agency. June 27, 2024. Retrieved January 19, 2026.
  137. ^ “Thales Alenia Space signs a contract with Mohammed Bin Rashid Space Centre to develop the Emirates Airlock Module, a critical element of Lunar Gateway”. Thales Alenia Space. February 4, 2025. Retrieved January 19, 2026.
  138. ^ Berger, Eric (March 6, 2026). “NASA has shuffled its Artemis rockets. But what of the lunar landers?”. Ars Technica. Retrieved March 28, 2026.
  139. ^ “Gateway Space Station”. www.nasa.gov. NASA. June 12, 2023. Retrieved January 19, 2026.
  140. ^ a b Paul Kessler (August 2022). “Artemis Deep Space Habitation: Enabling a Sustained Human Presence on the Moon and Beyond”. NASA. Retrieved April 18, 2023.
  141. ^ “NASA Identifies Candidate Regions for Landing Next Americans on Moon”. The National Aeronautics and Space Administration. Retrieved May 21, 2024.
  142. ^ a b c d Artemis Program – NASA’s Plan for Sustained Lunar Exploration and Development (PDF) (Report). NASA. Retrieved November 10, 2022.
  143. ^ “NASA Selects Companies to Advance Moon Mobility for Artemis Missions”. NASA. Retrieved April 3, 2024.
  144. ^ Foust, Jeff (April 15, 2024). “NASA document outlines selection of lunar rover companies”. SpaceNews. Retrieved April 15, 2024.
  145. ^ David, Leonard (July 1, 2022). “Where will NASA set up its moon base?”. Space.com. Retrieved May 12, 2024.
  146. ^ “Artemis Plan – NASA’s Lunar Exploration Program Overview” (PDF). NASA. September 2020. Retrieved November 10, 2022.
  147. ^ Weitering, Hanneke (February 12, 2020). “NASA has a plan for yearly Artemis moon flights through 2030. The first one could fly in 2021”. Space.com. Archived from the original on February 28, 2020. Retrieved February 20, 2020.
  148. ^ Berger, Eric (May 20, 2020). “NASA’s full Artemis plan revealed: 37 launches and a lunar outpost”. Ars Technica. Archived from the original on May 23, 2019. Retrieved May 24, 2020.
  149. ^ “Living on the Moon: Inside Artemis’ Foundation Habitat”. AmericaSpace. January 13, 2024. Retrieved June 16, 2024.
  150. ^ Nardi, Tom (December 4, 2023). “Italy Proposes Minimalist Lunar Outpost For Artemis”. Hackaday. Retrieved June 16, 2024.
  151. ^ a b c Public Domain One or more of the preceding sentences incorporates text from this source, which is in the public domain: “Exploration EVA System Concept of Operations Summary for Artemis Phase 1 Lunar Surface Mission”. ntrs.nasa.gov. NASA Technical Report Server. Archived from the original on April 28, 2021. Retrieved April 18, 2020.
  152. ^ “NASA to seek ideas for an Artemis lunar rover”. SpaceNews. November 20, 2019. Retrieved June 26, 2022.
  153. ^ Public Domain One or more of the preceding sentences incorporates text from this source, which is in the public domain: “Three Days in the Desert Tests Lunar ‘RV’. Nasa.gov. Archived from the original on July 26, 2020. Retrieved January 24, 2020.
  154. ^ Berger, Eric (July 15, 2020). “NASA’s first lunar habitat may be an RV-like rover built by Toyota”. Ars Technica. Archived from the original on July 15, 2020. Retrieved July 16, 2020.
  155. ^ Bullard, Benjamin (July 15, 2020). “NASA eyes closed-cabin rover ‘like an RV for the Moon’ in first step toward long-term lunar presence”. Syfy. Archived from the original on August 12, 2020. Retrieved July 16, 2020.
  156. ^ “NASA, Japan Advance Space Cooperation, Sign Agreement for Lunar Rover” (Press release). NASA.
  157. ^ Crane, Aimee (October 15, 2019). “Orion Suit Equipped to Expect the Unexpected on Artemis Missions”. NASA. Archived from the original on October 19, 2019. Retrieved October 24, 2019.
  158. ^ Mahoney, Erin (October 4, 2019). “A Next Generation Spacesuit for the Artemis Generation of Astronauts”. NASA. Archived from the original on October 19, 2019. Retrieved October 24, 2019.
  159. ^ “Orion Suit Equipped to Expect the Unexpected on Artemis Missions – NASA”. October 15, 2019. Retrieved April 9, 2026.
  160. ^ Jacobs, Shane; Green, Daniel; Deane, Nicholas; Tufts, Donald (July 2024). “Orion Crew Survival System Suit (OCSS) Development Update”. International Conference on Environmental Systems – via Texas Tech University Library.
  161. ^ Friedman, Vanessa (March 31, 2026). “Why the Artemis II Astronauts Will Be Wearing Orange”. The New York Times. ISSN 0362-4331. Retrieved April 10, 2026.
  162. ^ “NASA’s development of next-generation spacesuits” (PDF). August 10, 2021. Archived (PDF) from the original on August 10, 2021. Retrieved August 10, 2021. … the suits would not be ready for flight until April 2025 at the earliest … a lunar landing in late 2024 as NASA currently plans is not feasible.
  163. ^ Howell, Elizabeth (June 1, 2022). “NASA just picked these 2 companies to build next-gen spacesuits for the moon, space station”. Space.com.
  164. ^ Foust, Jeff (June 26, 2024). “Collins Aerospace pulls back from NASA spacesuit contract”. SpaceNews. Retrieved March 4, 2026.
  165. ^ Howell, Elizabeth (January 23, 2024). “Artemis moon spacesuits prepped for tests ahead of delayed 2026 lunar landing”. Space.com. Retrieved May 2, 2024.
  166. ^ Boyer, Charles (April 29, 2024). “Axiom Space Tests Lunar EVA Suit At Neutral Buoyancy Lab In Houston”. Talk of Titusville. Retrieved May 2, 2024.
  167. ^ Ugalde, Victoria (February 12, 2026). “NASA Moon Mission Spacesuit Nears Milestone”. NASA. Retrieved March 4, 2026.
  168. ^ Whittington, Mark (June 16, 2018). “NASA’s unnecessary US$504 million lunar orbit project doesn’t help us get back to the Moon”. The Hill. Archived from the original on November 14, 2019. Retrieved December 20, 2018.
  169. ^ “Moon Direct”. The New Atlantis. April 28, 2021. Archived from the original on April 28, 2021. Retrieved June 26, 2022.
  170. ^ “At Least 15 Starship Launches Needed to Execute Artemis III Lunar Landing”. SpacePolicyOnline.com. Retrieved December 30, 2023.
  171. ^ Foust, Jeff [@jeff_foust] (January 9, 2024). “Best part of the just-completed briefing: question about how many refueling launches will be needed for Starship HLS missions. NASA and SpaceX give a long answer without a number. Bill Nelson steps in, asks for that number. [’Ten-ish’ says SpaceX’s Jensen.]” (Tweet). Retrieved January 10, 2024 – via X (formerly Twitter).
  172. ^ Foust, Jeff (November 16, 2018). “Advisory group skeptical of NASA lunar exploration plans”. SpaceNews. Retrieved December 20, 2018.

Sources