[4] and Metrotren,[5] before its present name was adopted in the late 2000s. The line was also nicknamed the Orange Line due to its designation in the 1970s.
The line had 36 stations serving Metro Manila and Laguna. It was divided into two sections which met at Tutuban station in Tondo, Manila. The Metro North Commuter section ran from Tutuban to Governor Pascual station in Malabon and was colored light green on the system map of PNR. On the other hand, the Metro South Commuter section ran from Tutuban to IRRI station in Los Baños, Laguna and was colored orange on the system map of PNR. Some stations connected to LRT Line 1 and 2, and MRT Line 3.
The line ceased operations on March 28, 2024, to give way for the construction of the North–South Commuter Railway Extension Project (NSCR-Ex). Despite this, plans are underway to reinstate its tracks at a later date following the completion of the NSCR.
History
Manila Railroad local trains and Meralco Tranvias

The Manila Railroad Company, which preceded PNR, operated various local trains between Manila and its neighboring provinces. Trains from Tutuban will lead to Naic in Cavite, Pagsanjan in Laguna, Montalban in Rizal, and Bulacan during the 1920s.[6]
The Manila Electric Railroad and Light Company (Meralco) also operated electrified Tranvia services in what is now Metro Manila.[7] The 100 km (62 mi) tram system reached Malabon to the north, Pasig to the east, and Libertad (now part of Pasay) to the south, making it one of the longest in Asia in 1924.[8] Both systems were heavily damaged during the Battle of Manila in World War II.[8]
Previous commuter services
Metro Manila Commuter Service (1970–89)
The Metro Manila Commuter Service started on April 6, 1970, which started at Manila North Harbor and ended in Biñan, Laguna. During this decade, more stations were opened although some were either closed or relocated. In 1976, the commuter system peaked and extended as far north as San Fernando, Pampanga,[9] Guadalupe (located in Mandaluyong on the other side of Pasig River) to the east, and College to the south.[10] There were also services in the now-defunct Carmona branch line.[11]
Metrotren (1989–2009)
In 1990, the system was undergoing renovations under the working title Metrotrak.[4] By May of that year, the system was inaugurated as Metrotren to distinguish it from the LRT Line 1, then named “Metrorail”.[5] However, the Metrotren system eventually suffered neglect due to lack of funding and maintenance. Plans for expansion and rehabilitation such as the Manila–Clark Rapid Railway System project and Guadalupe line revival was also never realized.[12] Another proposal to rehabilitate the line, the Manila–Calabarzon Express was planned but did not succeed.[13]
Plans for an elevated expressway was conceived as the Pabahay sa Riles Tollway, a 16-kilometer (9.9 mi) route that would run above the railway tracks, and it would have partly competed with Metro Manila Skyway Stage 3.[14][15]
Metro Commuter

The Arroyo administration attempted to modernize the PNR system by rebuilding the lines and purchasing new rolling stock. PNR purchased 6 brand new diesel multiple units from South Korea and became its first order in 35 years.[16]
A complete rehabilitation of the line was initiated as the Northrail–Southrail Linkage. The project was financed by the Export–Import Bank of Korea and the Korean Economic Development Cooperation Fund[17] and was completed in 2010.[18] The government was also interested in reviving commuter rail services to the north via the Northrail project. However, the line stopped construction in 2011 and only pillars were built.[19] PNR also acquired second-hand multiple units from Japan as stopgap measures to its train fleet, ending the Metrotren era.[20] However, services were further suspended to Santa Rosa in 2014,[21] and to Alabang in 2015 due to safety issues and accidents on the line.[22] The North Main Line has also been closed.[23]
After nearly 20 years, PNR reopened the Metro North Commuter line, and launched the Caloocan–Dela Rosa shuttle line, on August 1, 2018.[24][25] This would be followed by a steady expansion and reintroduction of rail services to the north, currently reaching to Malabon, which has not seen rail activity for nearly 20 years. In 2017, the Department of Science and Technology announced its first Filipino-designed train and started trial services between Alabang and Calamba in 2018.[26] Services to Los Baños, Laguna via IRRI station were reopened in December 2019.[27]
In 2018, PNR acquired three diesel-hydraulic locomotives, 15 coaches, and six sets of diesel multiple units from Indonesian rolling stock manufacturer Industri Kereta Api (INKA). The INKA trainsets and 5 of the Hyundai Rotem DMUs comprise a 14-train fleet that will replace the aging PNR 900 class as well as the second-hand rolling stock, as these trainsets were planned to be transferred to the Bicol Region for the Bicol Commuter services after 2020.[28]
On February 16, 2023, DOTr announced the suspension of operations of the PNR system in Metro Manila for five years, along with the Metro Commuter services, to give way for the construction of the North–South Commuter Railway. The closures, initially expected to start by May 2023,[29] began on July 2, 2023, with the suspension of the Alabang–Calamba route.[30] The rest of the railway line temporarily closed on Maundy Thursday, March 28, 2024, with the last day of operations on the day before. The closure would fast-track the construction of the new railway line by eight months and save ₱15.18 billion in costs.[31] Current trainsets were transferred to operating services in Southern Luzon. The present line will also be rebuilt during and after the construction of the North–South Commuter Railway as it will serve as an alternate transport mode to the NSCR.[32]
Route

The Metro Commuter Line is predominantly aligned and shares the path of the PNR South Main Line which uses a dedicated right of way of its own. Prior to the line’s closure, it terminated at Calamba Station despite having rails further towards Legazpi, Albay, but few trains stop at Sta. Rosa and Calamba Stations further to the south. Inter-provincial services such as the Bicol Express and Mayon Limited are not running as of 2015 but plans to revive the services have been presented.[needs update]
- Legend
- Trains stop at stations marked “●”.
- Trains pass those marked “|”.
- Only morning and evening trains stop at stations marked “◇”.
- Morning and evening trains stopping only on Sundays at stations marked “X”.
- Evening southbound trains only load at stations marked “♦”.
- Morning and evening trains only unload at stations marked “♠”.
- For AA-LA-IRRI, some trains stop at stations marked ∆, while all trains stop at stations marked ✓
- closed stations
- MSC (TU-LA) — Metro South Commuter (Tutuban to Calamba)
- MSC (TU-IRRI) — Metro South Commuter (Tutuban to IRRI)
- MSC (AA-LA-IRRI) — Metro South Commuter (Alabang-Calamba- IRRI)
- MNC (TU-GP) — Metro North Commuter (Tutuban to Governor Pascual)
- MNC (GP-FTI) — Metro North Commuter (Governor Pascual to FTI)
- SS (TU-SU) — Shuttle Service (Tutuban to Sucat)
- SS (SA-SU) — Shuttle Service (Santa Mesa to Sucat)
- PT — Premiere Train
| Name | Distance (km) | Services | Transfers | Location | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Between stations | From Tutuban | From Governor Pascual | Metro Commuter | Shuttle | PT | ||||||||
| MSC (TU-LA) |
MSC (TU-IRRI) |
MSC (AA-LA-IRRI) |
MNC (TU-GP) |
MNC (GP-BIC) |
SS (TU-SU) |
SS (SA-SU) | |||||||
| Valenzuela | — | — | — | — | — | none | Valenzuela | ||||||
| Governor Pascual | 1.300 | 6.400 | 0.000 | ● | ● | Malabon | |||||||
| Caloocan | 0.800 | 5.100 | 1.300 | ● | ● | Caloocan | |||||||
| 10th Avenue | 1.460 | 4.300 | 2.100 | ● | ● | ||||||||
| 5th Avenue | 1.380 | 2.840 | 3.560 | ● | ● | ||||||||
| Solis | 1.460 | 1.460 | 4.940 | ● | ● | Manila | |||||||
| Tutuban | — | 0.000 | — | ● | X | ● | | | ● | ● | ||||
| Blumentritt | 2.730 | 2.730 | 5.530 | ● | ● | ● | ● | ||||||
| Laon Laan | 1.090 | 3.820 | 6.620 | ● | ● | ● | | | none | |||||
| España | 0.700 | 4.520 | 7.320 | ● | ● | ● | ● | ||||||
| Santa Mesa | 1.970 | 6.490 | 9.290 | ● | ● | ● | ● | ● | |||||
| Pandacan | 1.470 | 7.960 | 10.760 | ● | ● | ● | ● | | | none | ||||
| Paco | 1.500 | 9.460 | 12.260 | ● | ● | ● | ● | | | |||||
| San Andres | 0.960 | 10.420 | 13.220 | ● | ● | ● | ● | | | |||||
| Vito Cruz | 0.600 | 11.020 | 13.820 | ● | ● | ● | ● | | | |||||
| Buendia | 1.260 | 12.280 | — | ● | | | ● | ● | ● | Makati | ||||
| Dela Rosa | 0.120 | 12.400 | 15.200 | ● | ♦ | ● | | | | | | | ||||
| Pasay Road | 0.940 | 13.220 | 16.140 | ● | ♠ | ● | ● | ● | ● | ||||
| EDSA | 1.080 | 14.300 | 17.220 | ● | ♠ | ● | ● | ● | ● | ||||
| Nichols | 3.600 | 17.900 | 20.820 | ● | ♠ | ● | ● | ● | | | none | Taguig | ||
| FTI | 0.700 | 18.600 | 21.520 | ● | ♦ | ● | ● | ● | | | ||||
| Bicutan | 2.300 | 20.900 | 23.820 | ● | ♦ | ● | ● | ● | | | Parañaque | |||
| Sucat | 4.120 | 25.020 | — | ● | ♦ | ● | ● | ● | Muntinlupa | ||||
| Alabang | 3.673 | 28.693 | — | ● | ♦ | ∆ | ● | ||||||
| Muntinlupa | 3.320 | 32.013 | — | ◇ | ◇ | ∆ | | | ||||||
| Tunasan | — | — | — | — | | | | | |||||||
| San Pedro | 3.361 | 35.374 | — | ◇ | ◇ | ∆ | ● | San Pedro, Laguna | |||||
| Pacita Main Gate | 2.176 | 37.550 | — | ◇ | ◇ | ∆ | | | ||||||
| Golden City 1 | 1.170 | 38.720 | — | ◇ | ◇ | ∆ | | | Biñan, Laguna | |||||
| Biñan | 1.044 | 39.764 | — | ◇ | ◇ | ∆ | ● | ||||||
| Santa Rosa | 4.042 | 43.806 | — | ◇ | ◇ | ∆ | ● | Santa Rosa, Laguna | |||||
| Golden City 2 | 1.954 | 45.760 | — | | | | | | | |||||||
| Cabuyao | 1.660 | 47.420 | — | ◇ | ◇ | ∆ | | | Cabuyao, Laguna | |||||
| Mamatid | 5.530 | 52.950 | — | ◇ | ◇ | ∆ | ● | ||||||
| Banlic | 1.850 | 54.800 | — | | | | | | | |||||||
| Calamba | 1.338 | 56.138 | — | ◇ | ◇ | ✓ | Calamba, Laguna | ||||||
| Pansol | 4.490 | 60.628 | — | ◇ | ✓ | ||||||||
| Masili | 1.899 | 62.257 | — | ◇ | ✓ | ||||||||
| Los Baños | 2.382 | 64.909 | — | ◇ | ✓ | Los Baños, Laguna | |||||||
| College | 2.172 | 67.081 | — | ◇ | ✓ | ||||||||
| IRRI | 2.253 | 69.334 | — | ◇ | ✓ | ||||||||
|
| |||||||||||||